Decoration sequence of blank room how to install b

2022-07-22
  • Detail

For home decoration Xiaobai, home decoration is a headache. We should not only determine the home decoration style, calculate the budget, but also know the home decoration sequence, so as to get twice the result with half the effort. Then, what is the decoration sequence of rough houses? Now let's introduce in detail: the decoration sequence of the blank room and how to install the blank room are more time-saving and trouble-saving

for home decoration Xiaobai, home decoration is a headache. We should not only determine the home decoration style, calculate the budget, but also know the home decoration sequence, so as to achieve twice the result with half the effort. Then, what is the decoration sequence of rough houses? Now let's introduce in detail: the decoration sequence of the blank room and how to install the blank room are more time-saving and trouble-saving

decoration sequence of rough houses:

1. Measurement room

whether it is a rough house or an existing house, you must measure the house first before decoration, especially the accuracy of the data of the rough house, because it is related to the future home decoration pattern and decoration quotation,

2. Demolition and modification

the demolition and modification of rough houses is relatively simple, but before signing the contract with the decoration company, you should make sure whether it includes shoveling the wall skin, so as to avoid adding items at that time. After the demolition and modification is completed, the cabinet manufacturer can come to the door to measure the size

3. Water and electricity transformation

when carrying out water and electricity transformation, we should not only reserve sockets when slotting wiring, but also pay attention to the transformation of strong and weak electricity, because strong electricity is related to home appliances and lighting, and weak electricity is related to the display of mobile phones, computers and other equipment. After the circuit transformation is completed, you can start to be waterproof. After the waterproof material is dry, you should do a closed water test to test its waterproof property

4. Wrap the riser

the water pipes at home should be wrapped. It is recommended to use red bricks to stabilize them

5. Wall tiles, floor tiles

after entering the site, wall tiles should be made first, and then floor tiles, so as to facilitate the entry and exit of construction materials. In addition, soak in water before pasting tiles, so that there will be no warping, hollowing and other phenomena

6. Wall decoration

carpenters can work at the same time as painters, but they can't brush too much or too thick when painting. They can brush 5 or 6 layers at most to avoid cracking of the paint surface and affecting the effect of home decoration

7. Socket installation

when installing sockets, the more the better. In addition, the sockets commonly used in the kitchen should preferably be equipped with switches, rice cookers, microwave ovens, and sockets in the bathroom should be equipped with waterproof covers

8. Installation of kitchen and bathroom

when installing the ceiling of kitchen and bathroom, cabinets, range hoods and sinks can also be installed at the same time, but when installing, the flue of range hoods should not be too long to avoid flue blockage and aftertaste

9. Floor paving

when laying the floor, the wall should be leveled first, otherwise there will be a sound when stepping on it. In addition, a certain gap should be reserved during the laying to avoid the wood from being affected by the climate, such as thermal expansion and cold shrinkage, and warping

10. Wallpaper

glue and other materials should be used when pasting wallpaper, and the formaldehyde content in the glue is very high, and it is not easy to volatilize. Therefore, it is not allowed to move in immediately, and it should be placed for a period of time. In addition, the newly pasted wallpaper cannot be opened to prevent the wallpaper from drying quickly and wrinkling

11. Clean the furniture first, and then enter the site

when the above steps are completed, clean it first, and then enter the site. Clean all the furniture after entering the site, and do an indoor pollution test by the way. Check in after formaldehyde and other harmful gases volatilize

summary in the article: Well, the relevant knowledge about the decoration sequence of the blank room is introduced here. In fact, the decoration of the blank room is very simple, as long as the 11 steps in the article are completed step by step. Friends in need should learn it quickly